Construction Progress - 1. Phase
- R&R German Group
- May 14, 2024
- 2 min read
Updated: Oct 17
Here we post photos and videos from time to time so that you can follow the construction progress.
If you have any questions, please do not hesitate to contact us.

Check our YouTube Channel for more Videos
Bungalow No 1 - construction launch





Update 19.04.2024 - Blockwork done

Here we would like to introduce you to some highlights of our properties:
Solid construction, durable construction with several barrier levels to prevent rising damp
Room heights of approx. 2.90m
A major advantage of a high ceiling is of course that you have more headspace and more wall space. Rooms with a high ceiling will therefore always appear more spacious. The space suggests size, so to speak. But of course it also offers more space for wall decoration, the chance for an opulent ceiling light and options for taller furniture. In a new building, high rooms also allow for the installation of taller windows. So even more light. Not to be neglected: high windows also add a touch of extra luxury and class.
perfect electrical installation
Even if we know exactly what a good electrical installation looks like, we don't know how to set up your rooms later. That's why we are actively involved in electrical installation. The best thing is that we have already thought about the possible setup. The intended use of the rooms and the corresponding furniture is the basis for the later electrical installation. We always plan generously!
Well thought-out, innovative freshwater and wastewater management
Own, self-sufficient water supply
Own, self-sufficient water treatment
Update 04.06.2024 - Preparation Electrical Work

Kitchen

Kitchen

Lounge

Lounge

2nd Sleeping Room

2nd Sleeping Room

Corridor

Beach ;-))
Update 12.09.2024 - YouTube Post Construction Progress 1. Phase Bungalow
Please follow this YouTube Link to see our last video.
Update 16.10.2025 - 1st Bungalow in progress and we have started with 2cd Bungalow, Watertower is almost done
Bungalow No 1 - electrical installation

Bungalow No 1 - plaster inside and outside

Bungalow No 1 - master bathroom double washbasin

Bungalow No 1 - waterproof level under flooring

Bungalow No 1 - tiles on roof terrace

Bungalow No 1 - roof terrace

Bungalow No 1 - staircase to the roof terrace
Bungalow No 1 - screed
Bungalow No 2 - construction launch
Bungalow No 2 - wastewater pipes
Bungalow No 2 - preparation slab
Watertower Phase 1 - with 10.000 liter watertank

Bungalow No 2 - ready for slab
more is coming soon...